Document ID: ra8d2-sas-001 Version: 0.1 (first draft, Phase 7 of docs/QUALIFICATION_ROADMAP.md). Last refreshed: 2026-08-22 (migration qualification inventory refresh). Date: 2026-05-02. Author: Brighton Sikarskie. DO-178C reference: Section 11.20 (Software Accomplishment Summary). IEC 61508-3 reference: Clause 6.2.6 (Functional safety assessment summary). ISO 26262-6 reference: Clause 11 (Confirmation review).
Roll-up document presented to the certification authority or the independent assessor at SOI-4 / final assessment. Summarises what was planned, what was done, and the evidence supporting the claim that the planned process was followed. This is a maintained working draft, not a claim that the current candidate has been restamped. The release commit is frozen only when the evidence pack is issued; per-section detail distinguishes live authorities from dated retained artifacts.
ra8-firmware is bare-metal firmware for the Renesas RA8D2 MCU group, targeting the EK-RA8D2 evaluation kit (Renesas part number 968-K7EKA8D2S01001BE). The MCU is a dual-core R7KA8D2KFLCAC (Arm Cortex-M85 @ 1 GHz primary + Cortex-M33 @ 250 MHz secondary) with 1 MB on-chip MRAM, 1664 KiB SRAM with ECC, an Octo-SPI port to 64 MB external NOR flash, and a parallel-RGB port to a 1024 x 600 TFT plus an OV5640 5 MP camera. The firmware exercises the chip's HAL surface from a single hand-written register-level driver tree (no Renesas FSP source in the repo; FSP is reference material only). It supports a TrustZone secure / non-secure split, hosts an ARM-validated SOUP RTOS (ThreadX) and a SOUP networking stack (NetX Duo / lwIP). The live emulator-in-the-loop population is derived by scripts/dev/ra8_apps.py.
| Item | Value |
|---|---|
| Product | ra8-firmware |
| Repository | https://github.com/bsikar/ra8-firmware |
| Baseline commit | 402253efae5b0a6742b37eb14e6224f339d1cfbf (2026-05-02) |
| Target MCU | Renesas R7KA8D2KFLCAC (RA8D2 group) |
| Target board | EK-RA8D2 v1 (Renesas 968-K7EKA8D2S01001BE) |
| Primary core | Arm Cortex-M85 @ 1 GHz, with Helium / MVE |
| Secondary core | Arm Cortex-M33 @ 250 MHz |
| Code memory | 1 MB MRAM (non-volatile, on-chip) |
| System RAM | 1664 KiB (1.625 MiB) SRAM with ECC |
| External memory | 64 MB Octo-SPI NOR (IS25LX512M-JHLE), 64 MB SDRAM |
| Cross toolchain | ARM GNU Toolchain arm-none-eabi-gcc (qualified per |
| docs/qualification/TOOL_QUALIFICATION.md Section 1) | |
| Host toolchain | gcc-14 and clang-18 |
| Build orchestrator | Just + CMake + Ninja |
| RTOS | None at firmware level; SOUP ThreadX available per app |
| Debug probe | On-board SEGGER J-Link OB (serial in .env JLINK_SN) |
The software life cycle is the V-model defined in docs/qualification/SDP.md (Software Development Plan). Each life cycle phase is verified against the activities in docs/qualification/SVP.md (Software Verification Plan) and recorded against the cases / procedures in docs/qualification/SVCP.md and the captured outputs in docs/qualification/SVR.md. Configuration management follows docs/qualification/SCMP.md; quality assurance follows docs/qualification/SQAP.md. The full plan family is indexed by docs/qualification/PSAC.md (Plan for Software Aspects of Certification).
| Life cycle area | Plan / process document | Status (2026-05-02) |
|---|---|---|
| Planning | PSAC | Stub (Phase 7 deliverable) |
| Development | SDP | Stub (Phase 7 deliverable) |
| Verification | SVP | Stub (Phase 7 deliverable) |
| Configuration management | SCMP | Stub (Phase 7 deliverable) |
| Quality assurance | SQAP | Stub (Phase 7 deliverable) |
| Verification specification | SVCP | Working draft |
| Verification results | SVR | Working draft |
| Tool qualification | TOOL_QUALIFICATION | Working draft |
| MISRA-C 2012 deviations | MISRA_DEVIATIONS | Active (D-001 through D-012) |
The SAS will be re-issued at the close of Phase 7 once every plan has its first complete revision.
| Characteristic | Value | Source |
|---|---|---|
| Test source files | 693 (689 C, 4 C++) | retained 2026-08-22 snapshot |
| Registered CTest cases | 689 on clean standalone macOS and Linux configurations | retained 2026-08-22 snapshot |
| Linux/devcontainer host execution | 689/689 passed in 8.66 s on 2026-08-22 | retained unit-gate result; macOS execution not claimed |
| EIL application inventory | Derived by scripts/dev/ra8_apps.py | live app authority |
| RA8D2 physical-app builds | 118/118 built | retained historical snapshot; current matrix pending |
| Real HIL execution | Pending | run hil-all on the current candidate |
| Remote GDB lifecycle | Historical pass | restamp for release evidence |
| Coverage criterion | Achieved | Target | Archived evidence date |
|---|---|---|---|
| MC/DC, reachable decision-complete (gate) | 100.00% | 100% | 2026-05-03 |
| MC/DC, all decision regions complete | 92.29% | (informational) | 2026-05-03 |
| Deactivated decision regions (6.4.4.3) | 58 | - | 2026-05-03 |
These values are the archived 2026-05 snapshot, not a qualification result for the migrated tree. MC/DC is the Annex A Table A-7 objective 5 criterion that drives DO-178C Level B credit; the release evidence pack must rerun and restamp the current measurement.
The project uses MISRA-C 2012 as its coding language subset, per IEC 61508-3 Annex A.4 (Highly Recommended at SIL 3) and DO-178C section 11.8 (mandatory coding standard). The archived 2026-05-02 audit reported 1271 findings. That number is historical and is neither the current population nor a claim that every finding was accepted. The current audit is pinned to cppcheck 2.13.0, and docs/qualification/MISRA_DEVIATIONS.md records D-001 through D-012; its machine-checked index and .github/misra-baseline.txt are the current population authorities. D-001 through D-005 date from the archived audit; D-006 through D-012 were registered afterwards as scope and reviewed interfaces expanded. The dispositions are:
The complete deviation register is the authoritative artifact; this section does not claim a current migrated-tree population.
The archived docs/DOXYGEN_GAPS.md 2026-05 refresh reported no gaps in its then-current population. Regenerate the audit for the candidate under review; the archived count is not current evidence.
The current SOUP component population is derived from scripts/gen/sbom_registry.py and checked against the qualification pages under docs/SOUP/ (excluding its README). Each page has a written qualification basis citing IEC 61508-3 sec. 7.4.2.12 and DO-178C sec. 12.1.4: ThreadX, NetX Duo, USBX, LevelX, Mbed TLS, TF-PSA-Crypto, lwIP, Apache NimBLE, litehtml, miniz, stb, TinyXML-2. Re-review cadence is at most 12 months from each doc's "Last review" stamp. The behavioural-boundary verification basis for each SOUP is the distributed integration-test corpus under tests/, apps/**/tests/, and examples/**/tests/ – the SOUP itself is treated as black-box and is excluded from MC/DC instrumentation per docs/MCDC.md Section "Currently exempted code (SOUP)".
Cross-reference: docs/qualification/SVR.md Section 5 carries the full anomaly log. Summary of items deferred from v1 release:
| ID | Severity | Topic | Archived 2026-05 disposition |
|---|---|---|---|
| OP-001 | Major | USB device chapter-9 enumeration not implemented | Deferred (multi-day port) |
| OP-002 | Major | LevelX xSPI NOR returns 0xFFFFFF (chip silent) | Deferred (logic-analyzer) |
| OP-003 | Major | EVM apps stuck in *_panic_halt | Deferred |
| OP-004 | Critical | BLE apps attributed to a nonexistent Renesas patch image | CLOSED INVALID (6f6209a95): no on-chip BLE radio; controller is the ESP32-C6 companion |
| OP-005 | Critical | RSIP-E BIST blocked on AMC blob | Blocked (not vendored; public FSP, BSD-3-Clause) |
| OP-006 | Minor | Doxygen tag completeness | Recorded closed in the archived snapshot; current audit pending |
| OP-007 | Major | MC/DC reachable target | Recorded closed in the archived snapshot; current audit pending |
| OP-008 | Minor | Legacy smoke harness hung in the 2026-05 bench environment | Superseded by guarded just hil::run; manual HIL workflow remains available |
OP-001 through OP-003 describe the archived 2026-05 bench sweep and are not current full-fleet qualification results. Retained evidence is narrower: the 118/118 RA8D2 build, selected-app HIL, and remote-GDB lifecycle results are historical; current-matrix build and hardware execution are pending.
This document is the entry point to the certification evidence pack. The full pack consists of the artifacts below.
| Artifact | Path |
|---|---|
| Plan for Software Aspects of Cert. | docs/qualification/PSAC.md |
| Software Development Plan | docs/qualification/SDP.md |
| Software Verification Plan | docs/qualification/SVP.md |
| Software Configuration Mgmt Plan | docs/qualification/SCMP.md |
| Software Quality Assurance Plan | docs/qualification/SQAP.md |
| Software Verification Cases & Procs. | docs/qualification/SVCP.md |
| Software Verification Results | docs/qualification/SVR.md |
| Software Accomplishment Summary | docs/qualification/SAS.md (this document) |
| MISRA-C 2012 deviation register | docs/qualification/MISRA_DEVIATIONS.md |
| Tool qualification dossier | docs/qualification/TOOL_QUALIFICATION.md |
| Architectural baseline | docs/RING_AND_WORLD.md |
| Memory map | docs/MEMORY_MAP.md |
| MC/DC infrastructure / status | docs/MCDC.md, docs/MCDC_GAPS.md |
| MISRA infrastructure / status | docs/MISRA.md, .github/misra-baseline.txt |
| Doxygen audit | docs/DOXYGEN_GAPS.md, docs/DOXYGEN_GAPS.csv |
| Hardware bring-up record | docs/HARDWARE_BRINGUP.md |
| SOUP register | docs/SOUP/ |
| Vendor-blob blockers | docs/VENDOR_BLOBS.md |
| Roadmap (primary tracker) | docs/QUALIFICATION_ROADMAP.md |
| Build outputs (regenerable) | build/, tests/build/, tests/build-cov/ |
The current git working tree is the configuration-managed baseline. CM is via git per docs/qualification/SCMP.md; signed release tags will be added at SOI-4.
The project targets IEC 61508 SIL 3 (industrial functional safety, primary anchor) with parallel mappings to DO-178C Level B (avionics, drives MC/DC) and ISO 26262 ASIL C / ASIL D (automotive). The full side-by-side objective map is in docs/QUALIFICATION_ROADMAP.md Section 1.
Bounded claim: this codebase is developed against the process documented in CLAUDE.md and the planning family above, but this draft does not declare the current candidate qualified. The project is not yet submitted for independent assessment. The gap analysis between the maintained state and the SIL 3 / DAL B / ASIL C-D objective set is recorded in docs/QUALIFICATION_ROADMAP.md Sections 2 and 3, with a 22-week closure schedule.
Known non-conformances at the 2026-05-03 refresh:
This SAS will be re-issued at the close of each Phase to record progress against these items.
| Date | Author | Change |
|---|---|---|
| 2026-05-02 | Brighton Sikarskie | Initial first-draft population (Phase 7 kickoff). |
| 2026-05-03 | Brighton Sikarskie | Refreshed the then-current coverage, documentation, and HIL posture. |
| 2026-08-21 | Brighton Sikarskie | Replaced the flat-test and legacy app counts with the distributed 692-source / 673-registration inventory and current build, HIL, and remote-GDB evidence. |
| 2026-08-21 | Brighton Sikarskie | Added the authoritative Linux/devcontainer 673/673 unit result (46.92 s) while retaining macOS as registration-only. |
| 2026-08-21 | Brighton Sikarskie | Corrected the archived MISRA narrative to the pinned cppcheck 2.13.0 and current D-001..D-012 register without promoting historical counts. |
| 2026-08-22 | Brighton Sikarskie | Added the example-local runtime-provisioner test and recorded the 693-source / 689-registration inventory and Linux/devcontainer 689/689 result (8.66 s). |